Attic insulation ยท Columbus to the Ohio River
Attic insulation, done to the right depth
Blown in fiberglass or cellulose, topped up to the recommended level. Baffles at the eaves so the roof still breathes, a dam around the hatch so the insulation stays put. If the old stuff is matted or dirty, it comes out first.
Or text a photo to 740-590-5352.

What we do in your attic
- Measure what is there. Depth, type and condition of the old insulation, the ventilation, the hatch, and anything sitting in the way.
- Pull out the bad stuff. Matted, wet, dirty or animal soiled insulation comes out and gets hauled away. How removal works.
- Seal the big leaks, if you want it. Air sealing the openings into the attic can go on the price as its own line, so you see exactly what it adds.
- Baffles at the eaves. They hold the insulation back from the soffit vents so air keeps moving under the roof deck.
- A dam at the hatch. So the insulation does not spill when you open it.
- Blow it in level to the target depth with blown fiberglass or cellulose. Dan Inman's home in Athens got CertainTeed blown in insulation.
- Walk through it with you when it is done.
How much is enough
ENERGY STAR's recommendation for all of Ohio: R-60 in an attic with no insulation, and add R-49 if there are already 3 to 4 inches [1]. For new homes, Ohio's code is the 2019 Residential Code of Ohio [2], and it calls for R-49 in ceilings in both of Ohio's climate zones [3]. The newer 2021 model energy code raises that to R-60 [4]; Ohio has not adopted it. A house that is already built does not have to be brought up to new-home code: Unaltered portions of the existing building or building supply system shall not be required to comply with this chapter
[3]. It is still the right target.
A lot of older homes around here have about 4 inches. That is roughly R-11. Getting to R-49 means somewhere around 14 inches of cellulose, and more of fiberglass.
Signs your attic needs more
- You can see the tops of the ceiling joists. ENERGY STAR:
if the insulation is level with or below the attic floor joists, you probably need to add more insulation
[6]. - Upstairs rooms run hot in summer and cold in winter.
- Icicles and ice dams along the eaves. Why ice dams happen.
- The old insulation is gray, flat, wet or has animal droppings in it.
Attic jobs
From four inches to full depth



Questions about this job
What R-value should an attic have in Ohio?
ENERGY STAR recommends R-60 for an uninsulated attic in climate zones 4 and 5, which covers all of Ohio, and adding R-49 when there are already 3 to 4 inches [1]. For new homes, Ohio's code is the 2019 Residential Code of Ohio [2], and it calls for R-49 in ceilings in both of Ohio's climate zones [3]. The newer 2021 model energy code raises that to R-60 [4]; Ohio has not adopted it. A house that is already built does not have to be brought up to new-home code: Unaltered portions of the existing building or building supply system shall not be required to comply with this chapter
[3]. It is still the right target. We measure what is there before we price anything.
Can you blow new insulation over the old?
Yes, when the old insulation is dry, clean and lying flat. If it is matted, wet, dirty or soiled by animals, it comes out first. Topping up bad insulation just buries the problem.
Fiberglass or cellulose?
Both work and we install both. Settled cellulose runs about R-3.2 to R-3.8 per inch and loose fill fiberglass about R-2.2 to R-2.7, so fiberglass takes more inches to reach the same R-value and weighs far less doing it [5]. We tell you which one we would put in your attic and why.
Will it help the upstairs in summer?
Yes. The same attic that lets heat out in January lets it pour down into the bedrooms in July. A full attic keeps the upstairs from baking.
Get a price
Tell us about the job
A few details and a photo or two is all it takes. We call you back to set up a time to come out, measure, and give you one written price for the whole job.
Sources
- ENERGY STAR. Recommended Home Insulation R-Values.
- International Code Council. Ohio code listing: 2019 Residential Code of Ohio, 2018 IRC amended, effective July 1, 2019.
- Ohio Board of Building Standards. Residential Code of Ohio, Chapter 11 Energy Efficiency (rule 4101:8-11-01, effective July 1, 2019), Tables 1101.7 and 1102.1.2.
- International Code Council. 2021 International Energy Conservation Code, Chapter 4, Table R402.1.3.
- U.S. Department of Energy, Building America Solution Center. Loose-Fill Insulation.
- ENERGY STAR. What to Look For: DIY Checks and Inspections.

